CONTENT

REF.
      
 DESCRIPTION

 LINKS

 1. LESSONS                                                             
                                                                                                   
 
 1.1. What is Quantity Surveying?
 https://bit.ly/3hqrfkk                      
 1.2. What does Quantity Surveyor do?
 https://bit.ly/3hrpZ02
 1.3. What is Construction Floor Area (CFA)?
 https://bit.ly/2Awi94P
 1.4. What is Construction Cost Estimate Classifications?
 https://bit.ly/2AptkfM
  1.4.1. Concept Cost Plan
 https://bit.ly/2B2ub5R
  1.4.2. Schematic Cost Plan
 https://bit.ly/2C4FcnR
  1.4.3. Detailed Cost Plan
 https://bit.ly/3hqvj44
  1.4.4. Pre-Tender Estimate (PTE)
 https://bit.ly/2zsJyEe
 1.5. What is Tender Process?
 https://bit.ly/2AwlOzB
  1.5.1a. Pre-Qualification of Tenderers
 https://bit.ly/3cXiuL7
  1.5.1b. None Disclosure Agreement
 https://bit.ly/3fphpx1
 
 1.5.2. Tender Documents
 https://bit.ly/2B62KrI
  1.5.3. Tender Questionnaires (TQ) and Clarifications
 https://bit.ly/2MTwMBJ
 
 1.5.4. Tender Opening Record
 https://bit.ly/2AwnEjZ
   
  [......Continuously update....]
 
   
 2 CONSTRUCTION RATES
 
   
 2.1 Preliminaries Rates
 https://bit.ly/2YvLODd
 2.2 Plant and Equipment Rates
 https://bit.ly/3fpk0Hh
 2.3 All-In Rates (Architecture)
 https://bit.ly/2UHsC4f
 2.4 All-In Rates (Structure)
 https://bit.ly/37nRSBQ
   
  [......Continuously update....] 
   
 3 FORMAT-BILL OF QUANTITY (BOQ)
 
   
 3.1. GROUND INVESTIGATION WORKS
 
  Final Summary
 
  Section 1.0 Preliminaries
 
  Section 2.1 General Notes
 
  Section 2.2 Vertical Drillhole, Field Test, and Sampling
 
  Section 2.3 Laboratory Test
 
  Section 2.4 Cone Penetration Test (CPT)
 
   
  [......Continuously update....] 
   
 3.2 PILING WORKS
 
  Final Summary
 
  Section 1.0 Preliminaries
 

 Section 2.1 General Notes
 

 Section 2.2 Test Piles
 

 Section 2.3 Mass Piles 
   
  [......Continuously update....] 
   
 3.3 STRUCTURE WORKS
 

 Final Summary
 

 Section 1.0 Preliminaries
 

 Section 2.1 General Notes
 

 Section 2.2 Site Preparation and Excavation
 

 Section 2.3 Concrete Works
 

 Section 2.4 Formwork
 

 Section 2.5 Reinforcement
 

 Section 2.6 Structural Steel
 
   
  [......Continuously update....] 
   
 3.4 ARCHITECTURE WORKS
 

 Final Summary
 

 Section 1.0 Preliminaries
 

 Section 2.1 General Notes
 

 Section 2.2 Block Wall and Partition
 

 Section 2.3 Door and Window
 

 Section 2.4 Floor Finishes
 

 Section 2.5 Internal Wall Finishes
 

 Section 2.6 External Wall Finishes
 

 Section 2.7 Ceiling Finishes
 

 Section 2.8 Staircase Finishes
 

 Section 2.9 Roof Finishes
 

 Section 2.10 Sundries Items
 

 Section 2.11 Prim Cost and Provisional Sum
 
   
  [......Continuously update....]