  • [1] LESSON
  • _[1.1] What is Quantity Surveying?
  • _[1.2] What does Quantity Surveyor do?
  • _[1.3] What is Construction Floor Area (CFA)?
  • _[1.4] What is Cost Estimate Clasification?
  • __[1.4.1] Feasibility Cost Estimate
  • __[1.4.2] Concept Cost Plan
  • __[1.4.3] Schematic Cost Plan
  • __[1.4.4] Detailed Cost Plan
  • __[1.4.5] Pre-Tender Estimate (PTE)
  • _[1.5] What is Tender Process?
  • __[1.5.1a] Prequalification of Tenderers
  • __[1.5.1b] None-Disclosure Agreement (NDA)
  • __[1.5.2] Tender Documents
  • __[1.5.3] Tender Questionnaires (TQ) & Clarifications
  • __[1.5.4] Tender Opening Record
  • [2] CONSTRUCTION RATES
  • _[2.1] Preliminaries Rates
  • _[2.2] Plant And Equipment Rates
  • _[2.3] All-In Rates (Architecture)
  • _[2.4] All-In Rates (Structure)
  • [3] FORMAT - BILL OF QUANTITY
  • _[3.1] GROUND INVESTIGATION
  • __[3.1.1] Final Summary
  • __[3.1.2] Section 1.0 Preliminaries
  • __[3.1.3] Section 2.1 General Notes
  • __[3.1.4] Section 2.2 Vertical Drillhole, Field Test, and Sampling
  • __[3.1.5] Section 2.3 Laboratory Test
  • __[3.1.6] Section 2.4 Cone Penetration Test (CPT)
  • [4] FORMAT - CONTRACT
  • [5] QS PRACTICES
  • _[5.1] Climbing Formwork System

[3.1.6] Section 2.4 Cone Penetration Test (CPT)

SENG-QUANTITY SURVEYOR 6:22 AM

You may like these posts

0 Comments

Newer Older

Contact me

Tel: (+855) 86 978 770/ Email: sengboq168@gmail.com

Created By SoraTemplates | Distributed By Blogger Templates