- CONTENT
- [1] LESSON
- _[1.1] What is Quantity Surveying?
- _[1.2] What does Quantity Surveyor do?
- _[1.3] What is Construction Floor Area (CFA)?
- _[1.4] What is Cost Estimate Clasification?
- __[1.4.1] Feasibility Cost Estimate
- __[1.4.2] Concept Cost Plan
- __[1.4.3] Schematic Cost Plan
- __[1.4.4] Detailed Cost Plan
- __[1.4.5] Pre-Tender Estimate (PTE)
- _[1.5] What is Tender Process?
- __[1.5.1a] Prequalification of Tenderers
- __[1.5.1b] None-Disclosure Agreement (NDA)
- __[1.5.2] Tender Documents
- __[1.5.3] Tender Questionnaires (TQ) & Clarifications
- __[1.5.4] Tender Opening Record
- [2] CONSTRUCTION RATES
- _[2.1] Preliminaries Rates
- _[2.2] Plant And Equipment Rates
- _[2.3] All-In Rates (Architecture)
- _[2.4] All-In Rates (Structure)
- [3] FORMAT - BILL OF QUANTITY
- _[3.1] GROUND INVESTIGATION
- __[3.1.1] Final Summary
- __[3.1.2] Section 1.0 Preliminaries
- __[3.1.3] Section 2.1 General Notes
- __[3.1.4] Section 2.2 Vertical Drillhole, Field Test, and Sampling
- __[3.1.5] Section 2.3 Laboratory Test
- __[3.1.6] Section 2.4 Cone Penetration Test (CPT)
- [4] FORMAT - CONTRACT
- [5] QS PRACTICES
- _[5.1] Climbing Formwork System
0 Comments